Ara Waterway south-side lights are out on one section
Streetlights are out on the south-side bike and walking path from Maehwa Hill to the large cut slope, with no repair date yet
Carbon Neutral Points members using Ddareungi, Gbike or Changwon Nubija can receive four times the usual shared-bike credit on qualifying rides
Join both programmes before riding. Ddareungi users must also apply for the link inside the app.
Carbon Neutral Points members using Ddareungi, Gbike or Changwon Nubija can receive four times the usual shared-bike credit on qualifying rides.
If you are not already a Carbon Neutral Points member, join through the official programme website first. Then log in to the Ddareungi app and follow:
My info → Apply for Carbon Neutral Points → name lookup → consent to third-party use of personal data → apply
Gbike and Nubija users should follow their operator's participation instructions. The official event notice says the four-times incentive is paid in the following month. This is not an immediate fare discount or cash payment after each trip.
The programme's current incentive table sets a KRW 70,000 annual cap per person across Green Life Practice activities. Shared-bike riding uses the same annual allowance as other eligible activities, so KRW 400/km is not unlimited.
The campaign is scheduled to run through November 30, but the official event notice says it may change or end early depending on the available budget or operating circumstances. If you are joining late, check the current notice before assuming the temporary rate still applies.
Existing and new Carbon Neutral Points (Green Life Practice) members can receive four times the usual shared-bike credit from October 12 through November 30, 2026. The announced rate is points worth KRW 400 per kilometre.
The national event covers Ddareungi, Gbike and Changwon Nubija. You need both Carbon Neutral Points membership and an account with the participating operator before riding.
Ara Waterway south-side lights are out on one section
Streetlights are out on the south-side bike and walking path from Maehwa Hill to the large cut slope, with no repair date yet
Four Ara Waterway bike-path controls are scheduled in October
K-water lists two reduced-speed periods and two full closures on named Ara Waterway bike-path sections between October 17 and 25