Ara Waterway bike path closures start November 10
K-water has scheduled phased bike-path closures on the north bank and west-bank Gulpo-cheon connector from November 10 through December 31, 2026, including weekends and public holidays
Eight road sections around Uiamho have scheduled controls on October 25
Avoid road riding around the Uiamho loop during the October 25 controls. The separated bicycle path is not named as closed.
Eight road sections around Uiamho have scheduled controls on October 25. Road riders should avoid the loop during the listed windows. The notice does not confirm a bicycle-path closure.
| Road section | Time | Control |
|---|---|---|
| Soyang 2 Bridge – Gongjicheon Bridge | 07:00–15:30 | Full control |
| Gongjicheon Intersection – Samcheon Intersection | 07:00–13:30 | Full control |
| Samcheon Intersection – Songam Sports Town Intersection | 09:00–13:30 | Full control |
| Songam Sports Town Intersection – Uiam Dam | 09:00–13:00 | Full control |
| Uiam Dam – Sinmae Bridge | 09:00–13:00 | Sequential release |
| Sinmae Bridge – Chuncheon Dam | 09:30–14:00 | Full control |
| Chuncheon Dam – Yongsan Intersection | 10:00–15:00 | Full control |
| Yongsan Intersection – Soyang 2 Bridge | 10:30–15:30 | Partial control |
The official notice does not provide a bicycle-specific diversion. Follow police and event staff instructions at controlled roads, and do not assume the bicycle path is either open or closed from this road notice alone.
The Chuncheon Marathon runs around Uiamho on October 25, 2026, from 09:00 to 16:00. Road controls begin as early as 07:00 and continue as late as 15:30.
If your ride uses roads around the lake, avoid the loop during the control windows. The city notice covers road traffic. It does not say the separated bicycle path will close, so bicycle-path access is not established by this notice.
Ara Waterway bike path closures start November 10
K-water has scheduled phased bike-path closures on the north bank and west-bank Gulpo-cheon connector from November 10 through December 31, 2026, including weekends and public holidays
K-water closes named Ara Waterway sections after wind and rain
Both bicycle paths from Sicheon Bridge to Gyeyang Bridge, the west-bank Gulpo-cheon connector, Aramaru Observatory, and Ara Waterfall are closed for cleanup and maintenance