Ara Waterway bike path closures start November 10
K-water has scheduled phased bike-path closures on the north bank and west-bank Gulpo-cheon connector from November 10 through December 31, 2026, including weekends and public holidays
Bike.go’s Gumi-bo notice says stamp imprinting at the unmanned certification booth is temporarily suspended during refurbishment, with photo proof accepted at staffed centers
If you need the Gumi-bo stamp, take photo proof of yourself, your bike, and Gumi-bo, then show it at a staffed certification center.
Bike.go’s Gumi-bo notice says stamp imprinting at the unmanned certification booth is temporarily suspended during refurbishment, with photo proof accepted at staffed centers.
Bike.go says riders who need the Gumi-bo stamp during the maintenance period should take a photo showing:
yourself. your bike. Gumi-bo.
Show that photo at a staffed certification center. The notice says it will be recognized as stamp proof while the booth is under maintenance.
The official notice does not give a fixed end date. It says the temporary arrangement runs from January 10, 2026 until after the refurbishment.
That means the boring advice is the correct advice: take the photo before leaving the area.
Small problem. Easy to miss.
If you are collecting stamps, do not assume the booth will work normally when you arrive.
Ara Waterway bike path closures start November 10
K-water has scheduled phased bike-path closures on the north bank and west-bank Gulpo-cheon connector from November 10 through December 31, 2026, including weekends and public holidays
K-water closes named Ara Waterway sections after wind and rain
Both bicycle paths from Sicheon Bridge to Gyeyang Bridge, the west-bank Gulpo-cheon connector, Aramaru Observatory, and Ara Waterfall are closed for cleanup and maintenance