Shared-bike rides can earn points worth KRW 400/km through November 30
Carbon Neutral Points members using Ddareungi, Gbike or Changwon Nubija can receive four times the usual shared-bike credit on qualifying rides
The national bicycle portal posted a temporary closure and detour notice for part of the Ocheon certification route during ecological restoration work
The national bicycle portal posted a temporary closure and detour notice for part of the Ocheon certification route during ecological restoration work.
If you are riding a certification route, check the national portal or local notices before leaving. Especially after winter, flood repairs, or river restoration work.
The map may look finished. The path may not agree.
Shared-bike rides can earn points worth KRW 400/km through November 30
Carbon Neutral Points members using Ddareungi, Gbike or Changwon Nubija can receive four times the usual shared-bike credit on qualifying rides
Ara Waterway south-side lights are out on one section
Streetlights are out on the south-side bike and walking path from Maehwa Hill to the large cut slope, with no repair date yet